Services → Testing & Commissioning → MV & LV Systems

Medium voltage and low voltage systems testing

Medium voltage testing and LV testing of electricity distribution systems — before a new installation is energised and at intervals once it is in service. Work is carried out to BS 7671 and the relevant IEC standards, with calibrated instruments, by Chartered Electrical Engineers under an ISO 9001:2015 quality system.

BS 7671 multifunction tester measuring earth fault loop impedance on a low voltage distribution board
BS 7671 and IECthe standards every result is measured against
MV and LV11 kV to 33 kV and LV distribution to the final board
About 50 LV panels a dayso the outage window can be planned
Sri Lanka and the Maldivesown engineers and instruments on site

Medium voltage testing scope: what we test

Commissioning tests that prove a new installation is right, and periodic tests that prove an existing one has not drifted. Results are read on site — anything that fails is reported the same day.

Medium voltage systems

  • Insulation resistance of MV cables, switchgear and transformers
  • Contact resistance of circuit breakers, isolators and busbar joints
  • DC winding resistance of power transformers
  • CT and VT ratio, polarity and excitation checks
  • Protection relay testing by secondary injection, with trip-circuit checks
  • Substation earthing and soil resistivity

Low voltage electricity distribution systems

  • The full set of tests prescribed by BS 7671: continuity, insulation resistance, polarity, earth fault loop impedance, prospective fault current (to 50 kA), RCD operation and earth electrode resistance
  • Insulation resistance of LV cables, switchboards and motors
  • Contact resistance of ACBs, MCCBs and busbar joints
  • Field accuracy verification of CT-operated energy meters
  • Portable appliance testing

Commissioning a new MV or LV installation

A new installation is tested in a fixed order, so that nothing is energised until the tests before it have passed. We agree the sequence with your contractor at the start, and witness or carry out each stage.

01

Visual inspection before testing

Cable terminations, glands, labelling, clearances, busbar torque marks and earthing connections are checked against the drawings.

02

Insulation resistance

MV cables, switchgear and transformer windings, then LV cables and switchboards, each at the test voltage the standard sets for that equipment.

03

Contact resistance

Every breaker, isolator and bolted busbar joint, measured with a micro-ohmmeter, so a poorly made joint is found cold rather than by its heat later.

04

CT and VT checks

Ratio, polarity and excitation, so that meters and protection see what the drawings say they should.

05

Protection and trip circuits

Relays are tested by secondary injection against the approved settings, and every trip circuit is proved to open its breaker.

06

Earthing

Earth electrode resistance and, for substations, the earth grid, measured before the system is energised.

07

Energisation and on-load checks

Phase rotation, voltages and current balance once the system is live, then an infrared survey under load to catch any connection that is running hot.

Handover

What you receive

A commissioning report with every result against its acceptance limit and the standard behind it, instrument calibration certificates, and a clear list of anything that must be fixed before the installation is accepted.

Our test equipment

Our own instruments, calibrated, and operated by the engineers who interpret the results.

BS 7671 multifunction testers

Every test BS 7671 prescribes for LV installations, including fault current up to 50 kA.

Micro-ohmmeters

Contact resistance of breakers and joints; DC winding resistance of transformers.

CT / VT analyser

Ratio, polarity and excitation of current and voltage transformers.

Protection relay test sets

Secondary injection testing of protection relays and schemes.

LV and MV insulation resistance testers

Insulation resistance and polarisation index, LV to MV.

Soil resistivity tester

Four-pole (Wenner) soil resistivity and earth electrode resistance.

Energy meter field test set

Accuracy of CT-operated energy meters verified in place, under real load.

Portable appliance tester

In-service testing of portable electrical equipment.

Micro-ohmmeter measuring contact resistance across a test joint during medium voltage testingEngineer reading a four-terminal earth tester during a four-pole soil resistivity surveyProtection relay test set running a secondary injection test from a laptop at a substation

Where we have done it

Commissioning and periodic testing for industrial plants, power plants, utilities, commercial buildings and resorts across Sri Lanka and the Maldives.

See our projects →

Frequently asked

Which standards do you test to?

BS 7671 for low voltage installations, and the relevant IEC standards for the equipment under test — switchgear, instrument transformers, protection relays, transformers and meters. The report states the standard behind each result.

Do you test new installations and existing systems?

Both. Commissioning tests before a new installation is energised, and periodic tests for systems in service. A commissioning test proves the installation is right; a periodic test proves it has not drifted.

How long does LV testing take?

On a typical site, around fifty LV panels a day. We plan the sequence around your outage window and tell you before we arrive how long each shutdown needs to be.

Why verify a CT-operated energy meter in the field?

A CT-operated meter that reads wrong bills wrong — on a bulk supply, to a tenant, or against a solar export agreement. Field verification checks the meter's error under the real load, in place, without removing it.

Energising something new, or testing something old?

Send the single-line diagram and tell us which. We will scope the tests, tell you the outage window they need, and quote.

Request a quote

At Vibhawa, we offer state-of-the-art Electrical Consultancy, Testing, Condition Monitoring and Engineering Services designed for the needs of tomorrow’s world.

Services

Electrical Testing

Infrared Thermography

Electrical Consultancy

Electrical Design

Compliance Monitoring

Other Services

Recent news

  • All Post
  • Blog
  • News & Insights
  • work

© 2025 Vibhawa Consultants. Site By Remnis Global

Scroll to Top